Cable Trenching & Underground Conduit in Sydney & the Sutherland Shire

Cable trenching is the excavation, conduit and backfill that gets power, data or security cable from one part of a property to another underground — to a shed, granny flat, pool, studio or a camera at the front gate. We dig with our own plant and crew, pull and terminate the cable under NSW Electrical Contractor Licence 350318C, and put the surface back.

Most trenching jobs start as something else: a shed that needs power and a light, a granny flat that needs its own sub-main, a pool that needs a pump circuit, a gate motor forty metres from the nearest switchboard, or a camera at the boundary with nowhere to plug in. The trench is the part nobody wants to think about and the part that decides the price — because what's under the lawn between A and B is the only real unknown on the job. We trench for consumer mains and sub-mains, lay conduit, ducting and draw pits, pull and terminate the cable, and reinstate what we cut through.

Trenching is where our two licences stop being a marketing line and start saving a handover. The excavation itself isn't licensed electrical work, but the cable in the trench, the connection at both ends and the certificate at the finish all are — and when a security or data cable shares the trench, that's our other licence again. One Caringbah-based crew digs, lays, pulls, terminates, tests and certifies, so there's no gap between the excavator operator and the electrician, and no one to blame if the conduit turns out to be in the wrong place. We've been installing across Sydney since 2013.

What's included

  • Trenching for underground consumer mains and sub-mains — power out to a shed, granny flat, pool, studio or second dwelling
  • Conduit, ducting, draw pits and marker tape — spare conduit is cheap while the trench is open and expensive once it's closed
  • BYDA enquiry and service location before the machine starts — plans obtained and the route proved by hand over known services
  • Power, data and security conduit in one trench, segregated to the wiring rules rather than by eye
  • Cable pull, termination and CCEW for the licensed electrical portion — the same company digs, energises and certifies
  • Backfill, compaction and reinstatement — turf, pavers, concrete and driveway make-good, quoted as a line rather than assumed

How we work

  1. Free site visit and route walk

    We walk the run with you end to end, measure it, and note every surface along the way — lawn, garden bed, paving, concrete, driveway crossing — along with where the board is and where the machine can physically get in. Free within 100 km of Caringbah.

  2. Design & itemised quote

    Priced ex-GST per metre of trench, with conduit, draw pits, cable, terminations, reinstatement and any rock allowance as their own visible lines. If ground conditions or the surface change the number, you can see which line moved and by how much.

  3. BYDA enquiry and service location

    We lodge a BYDA enquiry before excavation, review the returned plans against the marked-out route, and prove known services by hand before the excavator moves. Anything found that isn't on a plan gets marked up and worked around, not through.

  4. Excavation, conduit and cable pull

    The trench is cut to the depth the installation requires, conduit and a draw string laid, bends set so the cable can actually be pulled, cable drawn through and marker tape run in over the top before backfill starts.

  5. Backfill, reinstatement, testing & certification

    Backfill compacted in layers so the trench line doesn't sink six months later, the surface made good, circuits tested and recorded, and the Certificate of Compliance for Electrical Work issued for the licensed portion.

Compliance & licensing

Underground work carries two separate obligations and we treat them separately. Before excavation we lodge a BYDA enquiry and locate services on the ground, because a returned plan is a guide to where an asset is, not a guarantee. Then the installation itself: burial depth and mechanical protection for underground consumer mains and sub-mains are set by the AS/NZS 3000 wiring rules, and the required depth is not a single number — it depends on what the trench runs under and whether the cable is direct-buried or in conduit, so it's determined on the route rather than assumed. Licensed electrical work is carried out under NSW Electrical Contractor Licence 350318C and a Certificate of Compliance for Electrical Work (CCEW) is issued on completion.

Where the trench also carries camera, intercom, access-control or alarm cable, that portion is security work as well as cabling work, and Bioni holds NSW Security Master Licence 000108088 for it. It matters in a trench more than most places: once the ground is closed, whoever left a conduit short, unsegregated or without a draw string is long gone. Running the excavation, the electrical and the security cabling under one contractor keeps the depth, the separation, the marker tape and the documentation as one person's responsibility.

What moves the price

Trenching is quoted itemised ex-GST, priced per metre of trench with conduit, pits, cable and reinstatement on their own lines. What moves the number:

  • Run length — the base measure everything else multiplies against, taken on site rather than off a map
  • Ground type — the biggest variable in the Shire; soil digs, shale slows the machine, and Hawkesbury sandstone changes the job entirely
  • Depth — set by what the trench runs under and how the cable is protected, not chosen for convenience
  • Existing services and obstacles — water, gas, comms, irrigation, tree roots and old unmapped runs all mean hand-digging sections of the route
  • Reinstatement surface — turf is one price, lifting and relaying pavers another, and saw-cutting and patching concrete another again
  • Spoil — whether the material can stay on site or has to be carted away
  • Plant access — a machine that can drive to the route versus a run that has to be hand-dug through a side gate
  • Traffic control and permits — where the route leaves private property and crosses a footpath, nature strip or road

The trench is the expensive part, not the conduit — so while it's open, lay the spare. A second duct for data, a security cable or a future pool pump costs very little today and means never digging the same line twice.

Frequently asked

How deep does an underground power cable have to be buried in NSW?
There isn't one depth. The AS/NZS 3000 wiring rules set it as a set of cases, and which case applies depends on what's above the trench — garden and lawn, paving, or a driveway carrying vehicles — and on whether the cable is direct-buried or run in conduit, with additional mechanical protection allowing shallower installation in some situations. Marker tape above the cable is part of the same requirement. We work the depth out against the rules for your actual route at the site visit rather than quoting a number down the phone.
Do I need a Before You Dig enquiry to dig on my own property?
You should, and it costs nothing. BYDA is a free enquiry service — you lodge the dig area and the registered asset owners send back plans for what they have in it. Two limits are worth knowing: it only covers utilities registered with the service, so a private cable a previous owner ran to a shed is on nobody's plan, and the plans it returns are indicative, not survey-accurate. That's why we lodge a BYDA enquiry before excavation and still prove the route by hand over known services before any machine starts.
What does cable trenching cost in the Sutherland Shire?
Ground type first — it's the single biggest variable here. Beach sand around Cronulla and Kurnell digs quickly but wants care with trench walls; shale is slower; Hawkesbury sandstone is a different job again. After that it's metres of run, the depth the installation requires, what surface has to be reinstated, and whether a machine can reach the route or it has to be hand-dug through a side gate. It's quoted itemised ex-GST per metre after a free site visit, with the variables on separate lines so you can see which one is driving the total.
What happens if the trench hits sandstone?
Much of the Shire is Hawkesbury sandstone under a thin skin of soil, so we look for it at the site visit before anything is priced: outcrops in the garden, rock ledges showing in the fall of the block, what came out of the pool or the neighbour's footings, and how deep the beds are. That tells us the likelihood, not the exact line where rock starts — nobody knows that until the bucket is in the ground. So rock goes on the quote as its own visible allowance rather than arriving later as a variation, and you can see it before you commit. If we do hit it, there are usually three ways out and we'll talk through them on site: reroute around the ledge, which is often the cheapest; run shallower with additional mechanical protection where the wiring rules allow it for that route; or keep the run above ground along a structure or fence line where the site suits it. What we won't do is quietly leave a cable too shallow because the rock was hard.
Can power, data and security cables go in the same trench?
Yes, and one trench beats three. They go in separate conduits with the separation the wiring rules require between the power cable and the extra-low-voltage runs — that separation is measured and set, not eyeballed, and where the route can't give it, the rules allow other methods such as a barrier or suitably rated cable. Doing it as one excavation means one lot of digging, one lot of reinstatement, one set of marker tape, and no second trench across a lawn you've only just got back.
Who can run underground power to a shed or granny flat?
The digging itself isn't licensed electrical work — but the cable in the trench, the connection at the switchboard, the sub-board at the far end and the compliance certificate all are, and in NSW that's a licensed electrical contractor's work. We hold Electrical Contractor Licence 350318C and do both halves, which is the point: the crew that decides how deep the trench goes is the crew that has to certify the cable in it. If a trench is dug before the electrical scope is agreed, it's routinely dug twice.
Do you put the lawn, pavers or driveway back afterwards?
Yes, and it's a quoted line on the itemised quote, not an assumption. Backfill goes in compacted in layers so the trench line doesn't settle into a visible dip over the next few months. Being straight about the finish: turf knits back over a season and disappears; pavers lifted carefully and relaid usually come back very close, especially with a few spares. A concrete path or driveway can't be made invisible — a saw-cut and patch will always read as a patch, because new concrete never matches the colour and finish of cured. Where that matters, we look at routing around the slab at the site visit instead of through it.
What paperwork do I get after underground cable work?
A Certificate of Compliance for Electrical Work (CCEW) for the licensed electrical portion, with the test results recorded, plus a record of the route as installed — where the conduit actually runs, how deep, and what's in it. The second one matters more than people expect. The next person to put a shovel or a fence post in that ground could be a landscaper, a plumber or the owner after you, and an as-installed route is the difference between them working around your cable and finding it the hard way.

Reviews from Google

What our customers say.

5.0 from 7 Google reviews
Elena Donetsin the last week
Islam is an Excellent electrician — efficient, reliable, and always willing to help, even after hours when I had an urgent issue. He's responsible, punctual, and clearly takes pride in doing quality work. Highly recommend!
Kapanin the last week
We'd had a few parcels go missing from the common area of ​​our apartment building, so we got a Dahua system put in to cover it. Bioni and the team were punctual, tidy, and didn't leave until we were comfortable using everything. The cameras and app are still doing exactly what we wanted. Recommended. Months on, the cameras and app are still doing exactly what we wanted. Recommended.
Arthur Volonskia month ago
Absolutely outstanding service! They installed an EV charger for my Mazda 6e and had previously completed other electrical work for us. Everything was done professionally, neatly and to the highest standard. Reliable, friendly and excellent value. Highly recommended!
Ivan Ivakhno2 months ago
Recently had Bioni install an alarm system at our business and couldn't be happier. Andrew and the crew turned up on time, worked cleanly, and took the time to walk me through exactly how everything works before they left. No mess, no pressure, and the pricing was upfront with no surprises. It's been running perfectly since. Would recommend to anyone looking to secure their place!
Thomas Sohns2 months ago
Great service from start to finish. Thanks guys.

Where we do this work

Cable Trenching & Underground Conduit in Gymea, Sylvania, Menai — and the rest of our service areas.

Licences, registrations and coverage

Installing since
2013
NSW Security Master Licence
000108088
NSW Electrical Contractor Licence
350318C
ABN
86 628 597 946
NSW Government supplier
12432577
Depots
Caringbah & Nowra
Free site visit
Within 100 km